Skip to content
Neocity Education

Electrical: energy and power

Why a service connection is chosen by power and the meter counts energy: units, current, heat, the rule in Chile's RIC N°01 technical code and what a meter records

5 USD

In Chile the charge is made in pesos at the observed dollar rate on the day of purchase.

Available for purchase soon

Meanwhile, look through the sample pages. To hear when sales open, write to contacto@neocity.cl.

What it includes

Pages
17
Exercises
9: 3 basic, 3 intermediate and 3 challenge; 7 with a numerical answer
Sources cited
13
Class
40-minute script
Format
US Letter PDF and script as text
Zone of the tree
Branches
Stage
Competent

Este curso en español

When you finish you will be able to

Explain why a service connection is chosen by power and the meter counts energy.

What you learn

  • Calculate the energy and the power of an appliance with their units (W, kWh, J) and say which one answers “how much in total” and which “how much at once”.
  • Calculate the current of a single-phase or three-phase load from its power, its voltage and its power factor.
  • Read a demand curve: energy as an area, maximum power and load factor.
  • Apply rule 5.3 of Chile's RIC N°01 and the table in its annex 1.3 to check a single-phase service connection point by point.
  • Explain in one minute, with numbers, why a service connection is chosen by power and the meter counts energy.

Who it is for

Young people aged 16 to 24 who study or plan to study electrical engineering. It builds on engineering fundamentals (circuits) and on choosing and studying a specialization. Node stage: competent, that of the newly graduated engineer.

Sample pages

Page 1 of 17
Page 1 of 17
Page 8 of 17
Page 8 of 17

Class video

PDF + script; the class video arrives once it is recorded.