Schedule, cost and economic decisions
Sequence, critical path and float; direct cost, waste and margin; and how to decide by looking at time and cost together
5 USD
In Chile the charge is made in pesos at the observed dollar rate on the day of purchase.
Available for purchase soon
Meanwhile, look through the sample pages. To hear when sales open, write to contacto@neocity.cl.
What it includes
- Pages
- 19
- Exercises
- 10: 4 basic, 4 intermediate and 2 challenge; 7 with a numerical answer
- Sources cited
- 7
- Class
- 40-minute script
- Format
- US Letter PDF and script as text
- Zone of the tree
- Crown
- Stage
- Competent
When you finish you will be able to
Build the plan for a job with its critical path and its cost, and say how much margin it leaves.
What you learn
- Order the tasks of a job by their dependencies and draw its network.
- Calculate the duration of a job, its critical path and the float of each task with the forward and backward passes.
- Calculate the direct cost and the unit cost of an order, including waste with its base.
- Set the price for a given margin and calculate the margin a price leaves, in money and as a share of the price.
- Compare alternatives by their time and their cost, and explain the variances between planned and actual.
Who it is for
Young people aged 16 to 24 who already write the specification for a design and coordinate work in a group (courses “Designing to requirements” and “Coordinating without being the boss”). Stage in the tree: competent. Examples from electrical work: the student plans on paper and does not carry out electrical work.
Before this course
Sample pages
Class video
PDF + script; the class video arrives once it is recorded.

